Trace any batch back to the truck it came on.
Stock and production tracking for plants and warehouses, from unloading to loading.
Today
06:30One batch, from the truck in to the truck out.
Every paper is typed once. Matra works out the stock at each step.
Inward
The scale turns each pallet into a count.
Inward IN-0412
Truck 27 at dock 1
- Invoice qty
- 132 CFC
- Scale
- 0.0 kg
- Received qty
- ≈ 0 pcs
- Inward
- Store
- Issue
- Production
- Store
- Outward
Type any batch and follow it back to the truck it came on.
Search by batch, vehicle, invoice or work order. A batch opens with every paper behind it.
- OUT-0383 Outward, truck 25 at bay 1, 10 Sep
- D10SEP26 Finished goods store, 16 pcs left
- PR-0921 Production, line 1, 09 Sep Raw material D08SEP26 Packing material F-2209
- D08SEP26 Store, rack A3
- IN-0412 Inward, truck 27 at dock 1, 08 Sep
- OUT-0383 Outward, truck 25 at bay 1, 10 Sep
- D10SEP26 Finished goods store, 16 pcs left
- PR-0921 Production, line 1, 09 Sep Raw material D08SEP26 Packing material F-2209
- D08SEP26 Store, rack A3
- IN-0412 Inward, truck 27 at dock 1, 08 Sep
One account for all your sites.
Each site keeps its own stock and papers. You see the ones your role allows.
Every site under one sign-in.
Change site from the desk.
Search finds a batch at every site.
One bell for every site's notices.
Your company
Main plantPLANT1
D10SEP26, 16 pcs
WarehouseWH2
D10SEP26, 50 CFC
Packing unitPACK3
No match
- PLANT1Shift B output per man-hour moved
- WH2Truck 25 unloaded, 50 CFC
- PACK3A pallet on hold needs a decision
With Vayasya Setu
Matra and Vayasya Setu look at the same shift.
Setu knows who is rostered and who came. Matra knows the stock and the line. Together they tell the site what to do.
Vayasya SetuFrom Vayasya Setu
Shift C has 14 people rostered for 22:00.
From Vayasya Matra
Line 1 has material for about 1 h 45 m.
To the site
Issue 27 CFC to line 1 before 22:00.
From Vayasya Setu
Shift B has 11 of 14 people present.
From Vayasya Matra
Line 1 plans 396 pcs for shift B.
To the site
Expect about 311 pcs from shift B.
From Vayasya Setu
A missed punch is corrected: 12 present, not 11.
From Vayasya Matra
Shift B made 318 good pcs.
To the site
Output per man-hour is now 3.5, was 3.9.
Every pallet and every shift, on one record.
Matra works out the stock from the truck in to the truck out. Setu brings in the people behind it.
- Inward
- Store
- Production
- Store
- Outward
Matra is open to early sites.
Tell us about your plant or warehouse, and how you keep stock today.